1)Works done for M/s. Bayer India Ltd. (Bayer House, Hiranandani Gardens, Powai)
Cost Of Project in Lacs = 102.00
Time taken For Completion = 4 Months
Type of job done :
Main LT Panels, DB, cable & cable tray laying, piping & wiring for lighting, power, access control, CCTV, Music system & P.A. System, Fire alarm system. Installation of Earthing station, earthing strip & earthing wires, installation of switch socket outlet & light fittings & fixtures.

2)  Works done for M/s. HSBC Ltd. (Gandhi Market, Bangalore)
Cost Of Project in Lacs = 90.00
Time taken For Completion = 4 Months
Type of job done :
Main LT Panels, DB, cable & cable tray laying, piping & wiring for lighting, power, access control, CCTV, Music system & P.A. System, Fire alarm system. Installation of Earthing station, earthing strip & earthing wires, installation of switch socket outlet & light fitttings & fixtures.

3) Works done for M/s. S.P. Biotech Park Pvt. Ltd. Biotech Park, Phase - 1, Genome Valley, Turkapally (V), Shamirepet (M),
RR District - 500 078,
Secundrabad (Andhra Pradesh)
Cost Of Project in Lacs = 101.00
Time taken For Completion = 4 Months
Type of job done :
HT/LT Panels, Transformer, HT & LT Cable with HT Termination, Floor Panels, DB, cable & cable tray laying, piping & wiring for lighting, power. Installation of Earthing station, earthing strip & earthing wires, lightining system, installation of switch socket outlet & installation of light fitttings & fixtures, external wiring, lighting pole etc.

4) Works done for M/s. Star India Pvt. Ltd. Masterpiece Bldg., Andheri Kurla Road, Andheri (E), Mumbai.
Cost Of Project in Lacs = 100.00
Time taken For Completion = 4 Months
Type of job done :
Office Interior including Main HT/LT, Panel/DBs, Cables/Mains, Point Wiring, Voice/Data wiring, Floor Raceways, Light fitting & Fixtures, Earthing & Miscelleneous, Fire-Cum-Alarm System, Music-Cum-PA System, Telephone Wiring, Card Access Control System, Dismantling & Miscellaneous works etc

5) Works done for M/s. Ogilvy & Mather Ltd. (Grd., 2nd, 3rd & 4th Floor, Trade Centre at Kamala Mill Compound, Lower Parel, Mumbai)
Cost Of Project in Lacs = 50.00
Time taken For Completion = 3 Months
Type of job done :
Main LT Panel/DBs., Cable/Mains, Point Wiring, Cable tray, Telephone/Intercom Wiring, Floor Raceways, Lighting Fixtures etc.

6) Works done for M/s. Standard & Charted Bank (Phoenix Mill Compound, Lower Parel, Mumbai.)
Cost Of Project in Lacs = 50.00
Time taken For Completion = 3 Months
Type of job done :
including Main LT/DBs., Cable/Mains, Cable Tray, Point wiring, Telecom/Intercom Wiring, Floor Raceways, Installation of Lighting Fixtures etc.

7) Works done for M/s. Birla Retail Ltd. (Near Ascot Centre, Andheri (E), Mumbai.)Cost of Project in Lacs = 55.00
Time taken For Completion = 2 Months
Type of job done :
including Main LT/DBs., Cable/Mains, Cable Tray, Point wiring, Telecom/Intercom Wiring, Floor Raceways, Installation of Lighting Fixtures, D. G. Cabling Work.

8) Works done for M/s. Pantaloon (Big Bazaar) Sinhgad Road,Pimpri,Khotthrud Pune, Mega Mall, Kalyan Mumbai.
Cost of Project in Lacs = 46.00
Time taken For Completion = 2 Months
Type of job done :
Fixing of DB, cable & cable tray laying, piping & wiring for lighting, power, access control, CCTV, Music system & P.A. System, Fire alarm system. Installation of Earthing station, earthing strip & earthing wires, installation of switch socket outlet & light fitttings & fixtures.

9) Works done For ACC Ltd. (Thane)
Cost of Project in Lacs = 40.00
Time taken For Completion = 2 Months
Type of job done :
Main LT/DBs., Cable/Mains, Point Wiring, Cable tray, Telephone/Intercom Wiring, Floor Raceways, Lighting Fixtures etc.

10) Works done for M/s. HSBC EDPI ACC Optimizatuion Project at Hitec
City, Madhapur, Hyderabad
Cost Of Project in Lacs = 564.70
Time taken For Completion = 6 Months
Type of job done :
Main LT Panels, DB, cable & cable tray laying, piping & wiring for lighting, power, Installation of Earthing station, earthing strip & earthing wires, installation of switch socket outlet & light fitttings & fixtures.

11) Works done for M/s. GMR Energy Ltd, BKC, Mumbai
Cost Of Project in Lacs = 75.69
Time taken For Completion = 4 Months
Type of job done :
Main LT Panels, DB, cable & cable tray laying, piping & wiring for lighting, power, FM200 and VESDA,Fire Alaram, Access Control, Sprinklerr, Music System, 2X40 KVA UPS System, Installation of Earthing station, earthing strip & earthing wires, installation of switch socket outlet & light fitttings & fixtures.

 